For many years, the Mayoka borehole was the most productive and important borehole for the hospital's water supply. Over the years, both the electrical supply and the pump itself have been damaged.
A new electrical cable had to be laid from the emergency generator to the panel house and set 1 meter deeper. Due to the uneven power supply, a volt stabilizer had to be connected. Then the borehole was flashed and a new Grundfos pump installed. Now the hospital's water supply is on a sound footing for the foreseeable future.
We would like to thank BEGECA for the organization and technical support for this project.
Doctors for Ifakara
ImprintSitemapPrivacy Policy